Essential to connect tower to standard header piping
Contains 2 header collectors, 2 plastic tri-clamps, 2 plastic pipe adapters, 4 keys and all necessary gaskets
To be installed on the top module of each tower
Simply to be connected via key lock system
Plastic pipe adapter available in different sizes, metric as well as ASTM standard
Plastic pipe adapter to be glued to standard hose or pipe sizes
Previous
Next
BASE SET
Essential to install tower on the tank bottom
Contains 4 corner feet, lifting rope and 4 keys
To be installed below the bottom (base) module of each tower
Simply to be connected via key lock system
Rope to be threaded through each module and to be connected on lifting device for installation of the tower inside the tank
Once tower is installed rope end to be fixed on header collector
Previous
Next
OPTIONAL FOR TOWER
SPRINKLER SET
Recommended for all applications with dead-end filtration and cake layer formation (filtration process without air-scouring)
Ideal for projects in which CEB and CIP (chemical contamination of filtered water piping) need to be avoided
Contains 2 perforated plastic pipes and 4 pipe clips
Pipe clips to be connected to header collectors
Previous
Next
AIR-SCOURING SET
Recommended for all applications in which a cake layer formation needs to be avoided (permanent air-scouring during filtration process), e.g. MBR or sludge thickening
Recommended for all applications with heavy cake layer formation to mix removed cake layer during backwash mode while filtration tank is drained
Contains 4 or 5 perforated plastic pipes and clip holders
Clip holders to be installed below the tower on the tank bottom (not connected to the tower)